5. DETAILED REQUIREMENTS
5.1 Project planning and oversight
5.1.1 Software development planning
5.1.2 CSCI test planning
5.1.3 System test planning
5.1.4 Software installation planning
5.1.5 Software transition planning
5.1.6 Following and updating plans
5.2 Establishing a software development environment
5.2.1 Software engineering environment
5.2.2 Software test environment
5.2.3 Software development library
5.2.4 Software development files
5.2.5 Non-deliverable software
5.3 System requirements analysis
5.3.1 Analysis of user input
5.3.2 Operational concept
5.3.3 System requirements
5.4 System design
5.4.1 System-wide design decisions
5.4.2 System architectural design
5.5 Software requirements analysis
5.6 Software design
5.6.1 CSCI-wide design decisions
5.6.2 CSCI architectural design
5.6.3 CSCI detailed design
5.7 Software implementation and unit testing
5.7.1 Software implementation
5.7.2 Preparing for unit testing
5.7.3 Performing unit testing
5.7.4 Revision and retesting
5.7.5 Analyzing and recording unit test results
5.8 Unit integration and testing
5.8.1 Preparing for unit integration and testing
5.8.2 Performing unit integration and testing
5.8.3 Revision and retesting
5.8.4 Analyzing and recording unit integration and test results
5.9 CSCI qualification testing
5.9.1 Independence in CSCI qualification testing
5.9.2 Testing on the target computer system
5.9.3 Preparing for CSCI qualification testing
5.9.4 Dry run of CSCI qualification testing
5.9.5 Performing CSCI qualification testing
5.9.6 Revision and retesting
5.9.7 Analyzing and recording CSCI qualification test results
5.10 CSCI/HWCI integration and testing
5.10.1 Preparing for CSCI/HWCI integration and testing
5.10.2 Performing CSCI/HWCI integration and testing
5.10.3 Revision and retesting
5.10.4 Analyzing and recording CSCI/HWCI integration and test results
5.11 System qualification testing
5.11.1 Independence in system qualification testing
5.11.2 Testing on the target computer system
5.11.3 Preparing for system qualification testing
5.11.4 Dry run of system qualification testing
5.11.5 Performing system qualification testing
5.11.6 Revision and retesting
5.11.7 Analyzing and recording system qualification test results
5.12 Preparing for software use
5.12.1 Preparing the executable software
5.12.2 Preparing version descriptions for user sites
5.12.3 Preparing user manuals
5.12.3.1 Software user manuals
5.12.3.2 Software input/output manuals 5.12.3.3 Software center operator manuals
5.12.3.4 Computer operation manuals
5.12.4 Installation at user sites
5.13 Preparing for software transition
5.13.1 Preparing the executable software
5.13.2 Preparing source files
5.13.3 Preparing version descriptions for the support site 5.13.4 Preparing the "as built" CSCI design and related information
5.13.5 Updating the system design description
5.13.6 Preparing support manuals
5.13.6.1 Computer programming manuals
5.13.6.2 Firmware support manuals
5.13.7 Transition to the designated support site
5.14 Software configuration management
5.14.1 Configuration identification
5.14.2 Configuration control
5.14.3 Configuration status accounting
5.14.4 Configuration audits
5.14.5 Packaging, storage, handling, and delivery
5.15 Software product evaluation
5.15.1 In-process and final software product evaluations
5.15.2 Software product evaluation records
5.15.3 Independence in software product evaluation
5.16 Software quality assurance
5.16.1 Software quality assurance evaluations
5.16.2 Software quality assurance records
5.16.3 Independence in software quality assurance
5.17 Corrective action
5.17.1 Problem/change reports
5.17.2 Corrective action system
5.18 Joint technical and management reviews
5.18.1 Joint technical reviews
5.18.2 Joint management reviews
5.19 Other activities
5.19.1 Risk management
5.19.2 Software management indicators
5.19.3 Security and privacy
5.19.4 Subcontractor management
5.19.5 Interface with software IV&V agents
5.19.6 Coordination with associate developers
5.19.7 Improvement of project processes




----